Newark weighs decade-long sewer-rate increases from 2027
City of Newark Division of Water and Wastewater, Ohio · Meeting date: November 16, 2026 · Published: November 17, 2026
A proposed sewer tariff would raise the administrative charge for all customers from $9.94 in 2027 to $19.66 in 2036, while the commodity charge would rise from $2.52 to $4.97. Council held the ordinance for consideration at its December 7 meeting.
Key points
- The proposed schedule would take effect on January 1, 2027 and set annual sewer charges through January 1, 2036.
- The universal administrative charge would increase from $9.94 in 2027 to $19.66 in 2036; the commodity charge would rise from $2.52 to $4.97.
- The proposal follows a wastewater master plan and rate study which found projected sewer revenue deficient against anticipated expenses.
- Council also held a companion sewer-code replacement that cites Ohio EPA and industrial pretreatment compliance requirements.
Full report
Newark City Council is considering a decade-long sewer-rate schedule that would lift the two charges applied to all customers each year from 2027 through 2036, following a wastewater master plan and rate study that identified a projected gap between sewer revenue and anticipated costs.
Ordinance 26-33 would amend the city’s sewer schedule of charges and fees, with an effective date of January 1, 2027. The proposed administrative charge for all customers would begin at $9.94 in 2027 and rise annually to $19.66 in 2036. The commodity charge would increase from $2.52 in 2027 to $4.97 in 2036.
The ordinance states that the rate study evaluated current and future revenue alongside operation and maintenance, personnel and debt expenses, compared with industry standards. It concludes that projected sewer revenue is expected to be deficient relative to anticipated sewer expenses and says increased user charges are necessary.
The schedule also sets differentiated debt-service charges for residential, commercial, industrial, governmental and institutional customers, with separate residential rates for usage below and above 3 CCF. Proposed 2027 residential debt-service charges range from $0.39 for usage below 3 CCF to $2.08 for usage above that level. Commercial, governmental and institutional charges are listed at $3.56 in both categories, while industrial charges are $2.08.
Industrial users would face scheduled surcharges for carbonaceous biochemical oxygen demand, total suspended solids, ammonia and chemical oxygen demand. The schedule also lists monthly industrial-waste surveillance charges through 2031, after which amounts are marked TBD.
Council held the rate ordinance to its December 7 meeting. It also held Ordinance 26-34, a proposed full replacement of Chapter 1040 of the city code governing sewers. The replacement code is intended to reflect modifications required for compliance with Ohio EPA and industrial pretreatment standards, covering discharge prohibitions, wastewater-strength limitations, industrial discharge permits, reporting, enforcement and sewer-service charges.
Under the proposed code, sewer-rental-fund revenues would be used for management, administration, operation, maintenance, debt service, land acquisition and debt-retirement reserves. It would require at least $150,000 annually from operation, maintenance and replacement revenues to be deposited in an interest-bearing sewage-works replacement account.
This summary was generated by AI based on the source document and may contain errors.
Source: City Council, City of Newark Division of Water and Wastewater