Florida State Representative Nan Cobb presented a $525,000 check to the Lake County Water Authority to fund the Pine Meadows Hicks Ditch Restoration, a critical stormwater and flood control project. The funding will clear the currently stagnant ditch to restore flow and mitigate local flooding.