Western Water adopts phased potable-water ban for nonfunctional turf
Western Municipal Water District, California · Meeting date: November 18, 2026 · Published: November 19, 2026
Western Municipal Water District’s board has unanimously adopted Ordinance 401 to implement California Assembly Bill 1572, creating local rules, compliance milestones and potential fines for irrigating nonfunctional turf with drinking water. The first restrictions take effect on public-sector properties on 1 January 2027.
Key points
- Ordinance 401 adds Chapter 5.42 to Western Water’s code and became effective immediately upon adoption.
- The potable-water irrigation prohibition begins for most public-agency and public-water-system properties on 1 January 2027; commercial, industrial and other institutional properties follow in 2028, with HOA common areas in 2029.
- Large affected properties with more than 5,000ft2 of irrigated area must certify compliance to the State Water Resources Control Board beginning in 2030 or 2031, depending on property type.
- Western Water may use notices, flow restrictors and escalating fines of $100, $200 and $500 for repeat violations, while staff said implementation will prioritise education, outreach and assistance.
- Residential properties, cemeteries, recreational-use areas, community spaces, and irrigation needed for trees, other perennial non-turf vegetation or immediate health and safety needs are exempt.
Full report
Western Municipal Water District has put in place its local mechanism to enforce California’s ban on potable-water irrigation of nonfunctional turf, approving Ordinance 401 ahead of the first state compliance date on 1 January 2027.
The board approved the ordinance 5-0 on 18 November following a public hearing. The measure adds a dedicated Chapter 5.42, Nonfunctional Turf Water Use Regulations, to the district code. It is intended to implement Assembly Bill 1572, which requires public water systems to adopt or revise local regulations, ordinances or policies enforcing the state prohibition.
Western Water stressed that the measure does not create requirements beyond those prescribed by the state. The standalone chapter is separate from the district’s existing water-shortage and conservation rules, while retaining those rules in force.
The restrictions will be introduced in phases. From 1 January 2027, potable-water irrigation of nonfunctional turf will be prohibited on properties owned by the Department of General Services and by local governments, local or regional public agencies and public water systems, except qualifying properties in disadvantaged communities. Those disadvantaged-community public properties have until 1 January 2031, or until state conversion funding becomes available, whichever is later.
All other institutional properties, along with commercial and industrial sites, are subject to the restriction from 1 January 2028. Common areas of homeowners’ associations, common-interest developments and similar entities follow on 1 January 2029.
The ordinance defines nonfunctional turf as turf not located in a recreational-use area or community space. Examples include ornamental turf, turf within street rights-of-way and parking lots, strips 10ft wide or less beside sidewalks, fences or buildings, turf at entries or signage areas, and turf on slopes of at least 25% grade. Turf permanently closed off from access for recreation or assembly is also covered.
The rules exclude residential properties, cemeteries, recreational-use areas and community spaces. They also allow irrigation necessary to maintain trees and other perennial non-turf vegetation, or to address an immediate health and safety need.
Customers with more than 5,000ft2 of applicable irrigated area must certify compliance with the State Water Resources Control Board. Commercial, industrial and institutional properties must begin certification by 30 June 2030 and repeat it every three years through 2039. Applicable HOA and common-interest-development areas begin by 30 June 2031, with three-yearly certification through 2040. Proof must also be supplied to Western Water.
The district may enforce the requirements through written notices, flow-restricting devices installed at the customer’s expense, and fines. The fines start at $100 for a first violation, rise to $200 for a second violation within one year, and reach $500 for each subsequent violation within that period. Staff said the district intends to lead with customer education, awareness and voluntary compliance, while retaining enforcement authority for ongoing violations.
Western Water has begun converting its own applicable landscaping. Staff said the Bergamont Pump Station Turf Transformation Project is the district’s remaining property with nonfunctional turf requiring work, and is expected to be completed in spring 2027.
This summary was generated by AI based on the source document and may contain errors.
Source: Board of Directors Meetings - Regular Board Meeting, Western Municipal Water District